To confirm you have the most recent installation instructions please contact technical services.
Uniclic flooring installation instructions.
The panels can be clicked together simply thanks to the ingenious shape of the tongue and groove.
Naturetek instructions naturetek select instructions naturetek plus instructions.
Recommended for most areas position the plank to be installed at an angle of 20 to 30 to the plank already installed.
Watch our laminate flooring installation videos and learn to install our laminate floors like a professional.
The panels can be clicked together simply thanks to the ingenious shape of the tongue and groove.
We also have flushmount and uniclic installation videos.
Installing sheet vinyl consult your flooring retailer about the recommended method of installing your mohawk sheet vinyl.
In rows where there is a pipe make sure the pipe falls exactly in line with the short side of two panels.
Locking profile for both sides of the panels.
Download laminate plank installation tile installation guides.
Uniclic the traditional glueless locking technology.
Installation instructions uniclic is a revolutionary system for installing laminate floors without using glue.
Fast and simple installation in all possible ways.
Take a drill bit with the same diameter as the pipe plus 20mm 3 4 for the expansion.
Install the uniclic panels crosswise to the direction of the existing sub floor.
Click the panels together on the short side and drill a hole in the center of the joint between the two panels.
Remove any obstacles and provide sufficient ventilation minimum 4cm 1 1 2 of total ventilation holes per meter 40 of floor.
General uniclic angle is a revolutionary system for installing laminate floors without using glue.
Position the panel to be installed at an angle of 20 to 30 to the panel already installed.
Uniclic is unique because you can install the planks in two different ways.
With the patented uniclic multifit vinyl planks can be installed horizontally vertically or at an angle so installation is easy and saves you both money and time.
The substrate temperature must be between 65 f and 85ºf 18ºc and 29ºc at the time of installation un opened cartons of flooring should be stored flat and neatly stacked in the climate controlled installation area for a minimum of 48 hours prior to installation to allow product to acclimate.
Move the plank gently up and down while applying forward pressure.
It is necessary that the crawl space under the plank floor be sufficiently ventilated.
Unilin invented the uniclic patented joint locking system.